Skip to content
Monday – Friday: 7 a.m. – 5 p.m.Lead-Safe Certified Firm (RRP) · US Firm # 000000VerifyGeneral liability insuranceWorkers' compensation coverage
2 more licenses
  • Lead-Safe Certified Firm (RRP) · US Firm # 000000Verify
  • General liability insurance
  • Workers' compensation coverage
Night supervisor(518) 555-0102

Healthcare and institutional painting, Albany, NY

Repainted overnight. Handed back for the morning shift.

Leflore Healthcare Painting repaints corridors, patient rooms, clinics and stairwells in Albany and the Capital Region on nights and weekends, inside your infection-control rules, with a written plan for every area.

  • 6 p.m.

    Crews badge in
  • 6 a.m.

    Area handed back

A typical night window. Your written plan sets the real one for each area.

Bright clinic corridor with white walls, a wood floor and soft blue and teal lounge chairs along one side

After hours, hour by hour

One corridor, one night

This is the usual shape of a night. Your written plan moves the times to fit your unit, your census and your cleaning staff.

  1. 01
    5:30 p.m.

    Step 1: Badge in and walk

    The crew lead meets your charge nurse or facility contact, signs in the way your security desk asks and walks the area against the plan.

  2. 02
    6:00 p.m.

    Step 2: Set the barrier

    Barrier, floor covering and signs go up first. Vents and ceiling access are sealed or left alone as your plan says, and the area is photographed before a can is opened.

  3. 03
    7:00 p.m.

    Step 3: Prep with HEPA at the tool

    Patch, caulk and sand with HEPA vacuums on the tool, so dust is caught where it starts instead of swept up later.

  4. 04
    9:00 p.m.

    Step 4: Prime and paint

    Products from your approved list, a coat at a time, with fans and air handling set by your facility team. Dry time between coats is written into the plan.

  5. 05
    4:30 a.m.

    Step 5: Clean down

    Surfaces and floors wiped with your approved cleaner, tape pulled, barrier down, and waste out by the route your plan names.

  6. 06
    5:30 a.m.

    Step 6: Walk and hand back

    The crew lead and your contact walk the area together. Anything missed becomes a punch-list line, and keys, signs and vent covers go back as found.

Times are an example. Dry time, cure time and your census set the real ones, and the plan says when the area can take traffic.

Infection control

We follow your plan, step by step

Your infection-prevention team writes the permit for each area. We build to it, document it and hand it back clean.

We aren't your infection-prevention team and we don't stand in for one. The crew lead keeps your permit on site, and every barrier, cleaning step and handback is photographed for your file.

  • Barrier and signs up before any tool or can comes in

  • HEPA vacuums on every sander and scraper

  • Your approved products and your approved cleaner

  • Crews follow your hand-hygiene and PPE rules

  • Waste and cans leave by the route your plan names

  • A written log, photographed at barrier, mid-night and handback

White door wrapped in plastic beside a freshly prepped wall during a renovation

Where we paint

The areas facility teams hand us

One wing, floor or department at a time, so the rest of the building keeps running.

  • Corridor with a dark gray painted wall, a white wall and wood panels, lit and empty

    Corridors and patient rooms

    Walls, doors and frames, with wall guards and rails masked and kept.

    • One wing at a time

    • Doors and signs masked, not removed

    Patient areas
  • Clinic waiting room with red cushioned benches, a planter and a wood floor

    Clinics, exam rooms and waiting areas

    Wipeable finishes from your list, painted between the last appointment and the first.

    • Evenings and weekends

    • Treatment areas cleared by your staff

    Patient areas
  • Modern lobby lounge with a polished floor and large windows

    Stairwells, lobbies and offices

    Public and back-of-house spaces, with egress routes kept clear all night.

    • Security desk sign-in each shift

    • Sheen chosen by surface

    Other buildings

Credentials

Paperwork before the first night

What a facility asks for before a contractor comes through the door, in one place.

  • Registration

    • Lead-Safe Certified Firm (RRP)Verify

      US Firm # 000000 · U.S. EPA

      The federal rule for paid work that disturbs paint in homes and child-occupied buildings built before 1978.

  • Insurance

    • General liability insurance

      A certificate of insurance, with your facility named as certificate holder, comes before the first night.

    • Workers' compensation coverage

      Covers the crew on your site. The certificate comes with the vendor packet.

  • Documents for your file

    • Certificate of insurance

      Your facility named as certificate holder. Link the file here.

    • W-9

      The firm's current form, ready for your accounts payable team.

    • Safety data sheets

      One for every product on the bid, in a binder that stays with the crew lead.

    • Sample night plan

      A finished plan for one corridor: barrier, hours, contacts and handback.

    • Vendor packet

      Contacts, invoice terms and how to reach the night supervisor.

References

Where we have worked

Each entry says what was painted, when, and what the facility asked for. Facility contacts are shared by permission, for a reference call.

  • Surgery center

    Outpatient surgery center

    Corridors, pre-op bays and two waiting rooms, one wing at a time.

    • 11 weeknights

    • Barrier class set by the center's infection-prevention nurse

    • Facility contact released for a reference call

  • Clinic

    Dialysis and specialty clinic

    Exam rooms, a waiting area and the front desk, painted over two weekends.

    • Friday night to Sunday morning

    • Treatment chairs cleared by clinic staff

    • Hand-back walk with the clinic manager

  • Senior living

    Senior living, three floors

    Resident corridors and the dining room, one floor a night.

    • Handed back before breakfast service

    • No occupied resident room painted

    • Egress routes kept clear all night

  • Pediatric office

    Pediatric practice in an older building

    Exam rooms and a play area, with the EPA's pre-1978 rule applied to the child-occupied spaces.

    • Weekends only

    • Firm registration number on the bid

    • Dust control and clean-down photographed

Sample content.

Every facility's rules are different. These entries show the shape of a reference, not a result.

From facility teams

What the morning walk-through is like

“The plan named who to call at what hour, and the barrier was up before the first can opened. Our infection-prevention nurse looked over the photos on Monday and asked for no changes.”

Avis T.Facilities manager, outpatient clinic

“Hallways on three floors, one floor a night. Residents saw a sign instead of a mess, and the meal carts rolled at six.”

Eamon R.Operations manager, senior living community

“They asked the year the building went up before anything else, then told us how the lead rule applied to a space where children are.”

Roslyn K.Business manager, pediatric practice

Sample reviews.

Around Albany

Albany and the towns around it

Type a ZIP to see whether a crew can reach your building.

  • Albany County: Albany, Glenmont, Selkirk, Ravena, Coeymans, Altamont, Green Island · Hospital and clinic corridors, a night at a time
  • Rensselaer County: Castleton-on-Hudson, Nassau, Wynantskill, Averill Park · Clinics, senior living and schools across the river
  • Saratoga County: Waterford, Halfmoon, Mechanicville, Malta, Round Lake, Ballston Lake, Saratoga Springs · Medical offices and outpatient buildings
  • Schenectady County: Scotia, Glenville · Clinics and community buildings

We don't take buildings more than about an hour from Albany, and we don't paint a room while a patient or resident is in it. Your staff clear the area first.

Questions

What facility teams ask first

Do you work in occupied buildings?

Yes. Most of our work happens on nights and weekends in buildings that stay open. Your staff clear the area before we start, and we never paint a room while a patient or resident is in it. The plan names the area, the hours and who we call if something changes.

What is an ICRA, and who writes it?

ICRA stands for infection control risk assessment. Your infection-prevention team assigns the class for each area and writes the permit that sets the barrier, air handling and cleaning. We don't replace that team. We follow its permit and keep a copy on site with the crew lead.

Which paint and cleaner do you use?

Products from your approved list. If you have none, we propose products from the manufacturer's product data sheet and send the data sheet and safety data sheet with the bid. We don't make health claims about any coating, and we use the cleaner your environmental services team names.

Do you work in homes built before 1978?

We work in buildings of every age, and we ask the year built when you send an area. The EPA's lead rule (RRP) covers paid work that disturbs paint in homes and child-occupied buildings built before 1978, which can include pediatric offices and childcare rooms in older buildings. For those spaces the bid says how the work is set up and how dust is controlled, and our EPA firm registration number is on the credentials list.

What if an area can't be handed back on time?

The plan says who we call, at what hour, and what happens next: a longer barrier, a closed room for one more shift or a patch of floor kept clear. We tell you as soon as we know, and we don't leave a barrier up without your sign-off.

How does the walk-through work?

In daylight, usually with your facility contact and someone from infection prevention or environmental services. We measure, check the surfaces, note access and egress, and ask about shutoffs, fire-alarm contacts and parking. The written bid follows.

Start here

Request a walk-through

Three short steps. The office answers with a time for a daytime walk-through, or asks for floor plans first.

Hours
Monday – FridayToday
7 a.m. – 5 p.m.
Crews on site, every night
6 p.m. – 6 a.m.
Night supervisor, while a crew is on site(518) 555-0102

The facility

Type of building

Timing

When can crews work

How to reach you

The office answers during office hours. For work in progress, call the night supervisor.